I joined the Staples Lake Boathouse team at the start of the construction phase of the project. The team composed of Adam Jarvi, James Matthes, Grey Bialon, and myself worked closely starting with prefabricating structural components in our workshop at NewStudio Architecture. Once prefab was completed, we loaded everything into a Uhaul and drove it to the site on Staples Lake where we continued to work and complete the envelope. 
Back to Top